| 2004 |
Cegelec, Bratislava |
Project, delivery, and installation of switchboards and control system for cooling station, visualization and consumption measuring for PSA Peugeot Citröen Trnava |
2004
2005
|
Cegelec, Bratislava |
Air-conditioning control in workshops (press, welding, auxiliary operations, assembly) – delivery of control system, switchboards, project, installation, commissioning, connecting to supervisory system. HVAC control system for workhops TR1, TR2, TR4, TR10 for PSA Peugeot Citröen Trnava |
2004
2005
|
Cegelec, Bratislava |
System for local supervision of auxiliary activities workshop – data collection from cooling station, production of decarbonized water, compressor station, substation for PSA Peugeot Citröen Trnava |
| 2006 |
KPK s.r.o Martin |
Delivery and installation of control system for cranes in Portfix - Trutnov
|
| 2006 |
Eurobeton Bratislava |
Delivery and installation of control system for concrete mixing plant |
| 2007 |
SAV |
Delivery, installation, and commissioning of control system for infiltration chamber in Topolčany |
2007
|
Nefab (Schneider)
|
Design, production, and installation of switchboard, assistance in commissioning of automatic machine for production of wooden packing boxes in Levice |